pvalues
(pvalues expr...)
Runs one future per expression on the interpreter and the JVM -- each expression
on its own thread, conveying the creation-time bindings -- and dereferences them
in order, so the values answer in order like the oracle's while the branches
overlap. A failure surfaces at the deref in order, after the other branches were
started, wrapped in the oracle's ExecutionException over its condition. On the
WASM legs, which have no threads, each expression runs in order on the calling
thread: the same printed seq. An empty pvalues answers nil,
where the oracle's empty lazy seq prints (). As a value it answers the
run-time once-expansion delegate (see bound-fn); the oracle
refuses a bare macro name in value position at compile time.